Pertambangan

List_Requirement (Engineering)

  DATA REQUIREMENT Coal/Ore/Quarry  Mining  
  DESCRIPTIONS  Available  Not Available  Remark
( * )    A.  TOPOGRAPHY & SITUATION MAP   
∙       Topography Map (scale 1 : 1000 , 1 : 5000)   
▪              Pit area   
▪              Waste dump area   
▪              Infrastructure (building, stockpile, haul road ect.)   
∙       Boundary ( * )      
▪              Concession boundary ( * )      
▪              Pit limit ( * )      
▪              Waste dump limit   
∙       The latest mine situation map.   
∙       Land use   
∙               Creek and river   
∙         
( * )    B.  RESERVE, GEOLOGY , GEOTEHNIC   
∙       Bore hole data (coal and quarry)   
∙       Reserve ( * )      
▪              Mineable reserve   
▪              Seam/ vein thickness/ deposit geometry   
▪              Number of mineable seam/vein (coal/ ore) ( * )      
▪              Seam/ vein dip ( * )      
▪              Parting/ interburden thickness (coal and ore) ( * )      
▪              Quality (coal and quarry)   
▪              Coal/ ore/ quarry density   
▪              Swell factor   
▪              Recoverable factor estimated   
▪                
∙       Overburden   
▪              Top soil thickness   
▪              Weathering thickness   
▪              Lithology   
▪              Rock density   
▪              Seismic velocity   
▪              Swell factor   
▪              Rock strength   
▪              Silica content   
▪                
▪                
    
Halaman    :  2/3   
Revisi : 1   
 
DATA REQUIREMENT Coal/Ore/Quarry  Mining  
  DESCRIPTIONS  Available  Not Available  Remark
( * )      
∙       Geological Structure   
∙       Geotechnical   
▪              Geotechnical bore hole data ( * )      
▪              Rainfall data   
▪              Ground water data   
▪              Geotechnical analysis ( * )      
▪              Slope design recommendation   
▪                
▪                
  C.  PIT DESIGN   
∙       Pit ( * )      
▪              Contact pit design ( * )      
▪              Yearly pit design   
▪              Bench geometry ( * )      
▪              Overall slope   
▪              Pit wide   
▪              Working room area ( average & minimum)   
▪              Ramp wide   
▪              Ramp grade   
▪                
▪                
∙       Disposal ( * )      
▪              Capacity disposal ( * )      
▪              Contract disposal design   
▪              Yearly disposal design   
▪              Disposal ramp wide   
▪              Disposal ramp grade   
▪                
( * )    E.  HAUL ROAD DESIGN   
∙       Vehicle Design ( * )    ( * )      
∙       Grade (maximum, average)   
∙       Curve radius   
∙       Pavement material   
∙       Drainage, culvert, brigde ( * )      
∙       Source of material   
D.  PRODUCTION  ( * )      
∙       Coal/ ore/ quarry  production ( * )      
∙       Coal/ ore recovery ( * )      
∙       Quality target (coal)   
∙       Fragmentation target (ore/ quarry) ( * )      
∙       Haul distance to ROM / Plant/ Stockyard Revisi : 1      
Halaman    :  3/3    DATA REQUIREMENT Coal/Ore/Quarry  Mining  
( * )    DESCRIPTIONS  Available  Not Available  Remark
∙       Overburden removal   
∙       Re handling estimated ( * )      
∙       Waste hauling distance ( * )      
∙       Area mined/year   
    
  F.  WORKING SCHEDULE ( * )      
∙       Schedule of operation   
∙       Schedule holidays   
∙       Normal schedule shift/week   
∙       Estimated working hours   
    
  G.  INFRASTRUCTURE ( * )      
∙       Infrastructure for mobilisation activities   
∙       Workshop, camp, office area ( * )      
∙       Accommodation facilities & supply   
∙       Power supply   
∙       Water resources   
∙       Magazine (permit and management if required)   
∙         
  H. PROCESSING PLANT   
∙       Plant lay out ( * )      
∙       Hopper/ feeder construction/ size and capacity   
∙       Raw coal feeding method   
∙       Process flow   
∙       ROM/ clean coal layout and capacity   
∙       Clean coal feeding method   
∙         
    
  I.  OTHERS   
∙         
∙         
∙         
∙         
Revisi : 1   

Author: nathavarta

Leave a Reply